Choosing Work
One of the most challenging parts of leading an Agile team is developing a work plan without a formal project plan. For Agile and Scrum, all work is pulled from the product backlog, a giant list of To Do items. This is a hard transition for most people to make. Out of habit, people are used to doing project plans in MS Project. That method isn't necessarily bad on an Agile team. Let's compare the two methodologies:
Formal Task Hierarchy
After the problem to be solved is identified, the scope, work breakdown structure and project plan are developed. The work to be done is divided into components and further decomposed into small, discrete tasks and assign dates and deadlines.
Iterative Tasks
General goals for the product are developed in terms of what people need to do. The first few steps are identified and team members work on each task, reporting the work done.
When to Use Each
Like assigning work, the method of choosing work should be applied appropriately.
|
Formal Task Hierarchy |
Iterative Tasks |
|
The software project also has a material component, like a hardware device, printed materials, or other item that uses up real-world goods. |
The majority of the project is software-based. |
Wiki Pages
- Space Permissions and Access
- Copy a space
- FAQ
- Preconfigured Spaces
- Wiki Formats
- Assembla New User Orientation
- Working for an Assembla Employer
- Assembla Video Tutorials
- Issue Management
- Set up a Software Project
- Mercurial Version Control
- Tool bundle - integrated tkts
- Tool bundle - Designers
- Tool bundle - Collaboration
- Assembla REST API
- Document REST API
- Milestone REST API
- Ticket REST API
- Space REST API
- User REST API
- Scrum Report REST API
- Add Projects from Existing Pipeline
- Privacy of User Information
- On-site Subversion with Trac
- TracImportToAssemblaTickets
- New in this Release
- How to Pay Developers the Assembla Way
- Setup Email Alerts and RSS Feeds
- Tortoise SVN - Multiple People Files and Versions
- Responding to RFPs and RFQs with Assembla
- Work with Project Portfolios
- Integrate with Assembla
- Assigning Work
- Manage an Agile Software Team
- Assemble an On-Demand Team
- Assembla - Tracker and Screen Capture
- Choosing Work
- Holding Meetings
- How to Complete a Scrum Report
- Team Member Ramp Up
- Wiki Page Styles
- Add-on Tools
- Include Skype Status on a Wiki Page
- How to edit branded themes
- Email2TicketsGateway
Space Home