Version 2, last updated by Immortalis at May 05, 2010 10:55 UTC
Issues the 5.5.10
| Issue | severity |
Picking up the issues reported in SCRUM reports |
?? |
| Description |
Procedure for acting on the SCRUM report needs.
|
| Example |
Almost everybody has only done one SCRUM report. Most of them had "needs", but we haven't been that good at following up on the needs.
|
| Solution(s) |
Maybe assign one person to act on the SCRUM reports in order to make sure the "needs" don't go unnoticed and are acted upon. |
Issues the 16.4.10
| Issue | severity |
Difficult to meet because of time difference
|
3 |
| Description |
We find it difficult to meet because of the time difference. |
| Example |
We've more or less only been able to meet once a week. Typically on Saturday, which both makes the meeting long because there's much to talk about, but a five or six days is also a bit long to wait for something you want to discuss. |
| Solution(s) |
Maybe make common schedule so we get a better overview of when each of us have time. This will make it easier to plan meetings during the week and we might also go for shorter meetings instead of meeting just once a week, which tends to be quite long. |
Language barrier: do we understand the same things?
Updating minutes
| Issue | severity |
Difficult to meet because of time difference
|
3 |
| Description |
We find it difficult to meet because of the time difference. |
| Example |
We've more or less only been able to meet once a week. Typically on Saturday, which both makes the meeting long because there's much to talk about, but a five or six days is also a bit long to wait for something you want to discuss. |