Version 38, last updated by ania.pawelczyk at August 18, 2008 12:17 UTC
Work report
2008-08-18 (Monday)
8:00 - 9:00 menubut.test
9:30 - 12:00 winClipboard.test,
unixEmbed.test, unixButton.test,
raise.test
13:00 - 17:30 writing status update
17:30 - 18:15 testing,
fixing, cvsing
2008-08-17 (Sunday)
10:00 - 14:00(3h) panedwindow.test
18:00 - 22:00 testing, digging,
fixing, cvsing,
22:00 - 22:30 canvWind.test
22:30 - 24:00 menubut.test
2008-08-16 (Saturday)
9:00 - 11:00 imgPPM.test, imgBmap.test
11:30 - 15:00 listbox.test
18:00 - 20:00 grab.test, safe.test, util.test
21:00 - 22:30 panedwindow.test
23:30 - 1:30 testing,submitting
2008-08-15 (Friday)
11:00 - 12:00 geometry.test
12:00 - 13:00 focus.test
14:00 - 14:30 tk.test
14:30 - 16:30 grid.test
16:30 - 21:00 imgPhoto.test
21:30 - 22:30 imgPPM.test
2008-08-14 (Thursday)
11:00 - 13:00 focus.test
14:00 - 16:00 image.test
17:00 - 20:30 frame.test
20:30 - 22:00 font.test
22:00 - 3:00 testing, digging,
fixing, cvsing, mailing
Recently I haven't been updating regulary, so
from 24-07, the July's and the begining of
August's schedule is rather approximated,
but done according to cvs Changelog.
2008-08-13 (Wednesday)
9:00 - 18:00 menu.test
19:00 - 22:00 event.test
22:00 - 23:00 focus.test
23:30 - 1:30 testing,submitting
2008-08-12 (Tuesday)
9:00 - 15:00 clipboard.test
16:00 - 16:30 id.test
18:00 - 23:00 embed.test, choosedir.test
23:30 - 1:30 testing,submitting
2008-08-11 (Monday)
10:00 - 14:00 font.test
16:00 - 20:00 menu.test
22:30 - 1:00 clrpick.test
2008-08-10 (Sunday)
10:00 - 18:00 canvImg.test, canvRect,
canvText.test
2008-08-9 (Saturday)
13:00 - 20:00 canvImg.test, canvRect,
canvText.test
2008-08-8 (Friday)
10:00 - 20:00 font.test, canvImg
2008-08-7 (Thursday)
8:00 - 22:00 config.test,canvas.test
2008-08-6 (Wednesday)
10:00 - 18:00 canvPs.test, canvas.test
2008-08-5 (Tuesday)
visiting Google Krakow
2008-08-4 (Monday)
visiting Google Krakow
2008-08-3 (Sunday)
10:00 -14:00 testing, commits, evaluation letter
2008-08-2 (Saturday)
11:00 - 19:00 menu.test
2008-08-1 (Friday)
8:00 - 8:00 went away
2008-07-31 (Thursday)
text.test (a huge one and a lot
of time spent on that)
2008-07-30 (Wednesday)
upgrading my script, text.test
2008-07-29 (Tuesday)
text.test
2008-07-28 (Monday)
get.test
text.test
2008-07-27 (Sunday)
cursor.test
dialog.test
2008-07-26 (Saturday)
free day
2008-07-25 (Friday)
cmds.test
cursor.test
2008-07-24 (Thursday)
cursor.test
2008-07-23 (Wednesday)
10:30 - 23:00 (9h) bind.test
2008-07-22 (Tuesday)
11:00 - 14:00 cvs-ing
14:30 - 15:00 button.test corrections
20:00 - 22:30 bind.test
2008-07-21 (Monday)
14:30 - 18:00 corrections and updates in my done files
2008-07-20 (Sunday)
9:00 - 14:00 spinbox.test
14:30 -16:00 Mail to Jeff, collecting points
2008-07-19 (Saturday)
11:00 - 19:00(7h) my new script - helper
2008-07-18 (Friday)
8:00 - 8:00 went away
2008-07-17 (Thursday)
8:00 - 8:00 went away
2008-07-16 (Wednesday)
8:00 - 8:00 went away
2008-07-15 (Tuesday)
11:00 - 14:30 spinbox.test
2008-07-14 (Monday)
11:00 - 20:00(9h) entry.test, my helping script
2008-07-13 (Sunday)
11:00 - 22:00(9h) entry.test, font constraint
22:00 - 1:30 putting down changes, questions, notices
2008-07-12 (Saturday)
11:00 - 24:00(10h) entry.test, testImg constraint
2008-07-11 (Friday)
10:00 - 11:30 new info analisation
19:00 - 22:00 button.test - addings and again
touching up
2008-07-10 (Thursday)
13:30 - 13:45 bell.test
13:45 - 14:00 bgerror.test
14:15 - 15:15 correcting some points in button.test
15:15 - 15:45 testing individual tests - my script
16:00 - 16:30 bitmap.test
16:00 - 16:30 border.test
16:30 - 17:30 updating
2008-07-09 (Wednesday)
11:45 - 21:00 button.test
2008-07-08 (Tuesday)
11:00 - 3:00(~14h) writting email to Tclcore that
skets my goals - analysing my work,
outlining ideas, posing questions,
reconsidering and final conclusions
2008-07-07 (Monday)
11:00 - 19:00 message.test - corrections
button.test - corrections and implementing
22:00 - 0:00 first draft of email to tclcore
2008-07-06 (Sunday)
13:00 - 17:00(2.5h) message.test
17:45 - 21:00 button.test
2008-07-05 (Saturday)
13:00 - 14:00 Mails from TCL-CORE: Learning
advices and new assumptions
16:00 - 17:00 More SuSE configuring
19:00 - 1:00(3h) Learning about tcltest 1.0,
first drafts on message test
updating wiki - (?)frame.test frame-2.5
(after DKF's comment)
2008-07-04 (Friday)
13:00 - 15:00 TCL-CORE, TCL-SOC2008, D.K.Fellow mails
20:00 - 1:00 New systems instalations and settings,
configuring VisualStudio settings on XP
2008-07-03 (Thursday)
13:00 - 15:00 Collecting all together and presenting to Jeff;
writing organisation mail
16:15 - 17:00 Frame.test - frame-2.5 under windows
19:00 - 22:00(2h) Fonts and constraints; updating flow
22:30 - 4:30 Scrollbar.test; posting assembla flow; tunning up old flows
2008-07-02 (Wednesday)
11:00 - 13:00 comparing logs
examing why Total differ
15:00 - 24:00 wm.test:
> not updating after 'update' (wm-minsize-2.*) and
unspecified behaviour of test
> wm-geometry-2.1 - what's up in Ubuntu, comparing
with live distribution
> preparing questions on wiki
2008-07-01 (Tuesday)
9:30 - 15:00 frame.test
16:00 - 19:00 reading about widgets
22:00 - 24:00 http://www.assembla.com/wiki/edit/TkTests, svn
2008-06-30 (Monday)
11:00 - 12:00 TkTests on Ubuntu
12:00 - 12:30 collecting logs from systems
12:30 - 15:30 listbox.test invalid on Windows
(and eventualy, after solving out, finding out that I haven't
updated my Windows tcl, where the test is fixed; gained
primary experience though;) )
16:30 - 19:00 Scanning generic folder
2008-06-29 (Sunday)
9:00 - 11:30 (2.5h) what's the problem with font constraints on my Slack?;
constraints.tcl,
textIndex.test (tests pass if constraint font is removed)
11:30 - 14:00 encountered and fixing some difficulties with my system
14:00 - 15:00 installing ubuntu and stuff
17:00 - 21:00 configuring ubuntu, testing
2008-06-28 (Saturday)
9:00 - 12:00 (2.5h) preparing the mail to Jeff about project assumptions
20:00- 0:30 (3.5h) going through windows tests; winDialog.test
2008-06-27 (Friday)
14:00 - 16:30 meeting with Tomek Kosiak and analysing the project
18:00 - 22:30(1.5h) analysing message.c sources
22:30 - 1:00 preparing the mail to Jeff about project assumptions
8:00 - 9:00 menubut.test
9:30 - 12:00 winClipboard.test,
unixEmbed.test, unixButton.test,
raise.test
13:00 - 17:30 writing status update
17:30 - 18:15 testing,
fixing, cvsing
2008-08-17 (Sunday)
10:00 - 14:00(3h) panedwindow.test
18:00 - 22:00 testing, digging,
fixing, cvsing,
22:00 - 22:30 canvWind.test
22:30 - 24:00 menubut.test
2008-08-16 (Saturday)
9:00 - 11:00 imgPPM.test, imgBmap.test
11:30 - 15:00 listbox.test
18:00 - 20:00 grab.test, safe.test, util.test
21:00 - 22:30 panedwindow.test
23:30 - 1:30 testing,submitting
2008-08-15 (Friday)
11:00 - 12:00 geometry.test
12:00 - 13:00 focus.test
14:00 - 14:30 tk.test
14:30 - 16:30 grid.test
16:30 - 21:00 imgPhoto.test
21:30 - 22:30 imgPPM.test
2008-08-14 (Thursday)
11:00 - 13:00 focus.test
14:00 - 16:00 image.test
17:00 - 20:30 frame.test
20:30 - 22:00 font.test
22:00 - 3:00 testing, digging,
fixing, cvsing, mailing
Recently I haven't been updating regulary, so
from 24-07, the July's and the begining of
August's schedule is rather approximated,
but done according to cvs Changelog.
2008-08-13 (Wednesday)
9:00 - 18:00 menu.test
19:00 - 22:00 event.test
22:00 - 23:00 focus.test
23:30 - 1:30 testing,submitting
2008-08-12 (Tuesday)
9:00 - 15:00 clipboard.test
16:00 - 16:30 id.test
18:00 - 23:00 embed.test, choosedir.test
23:30 - 1:30 testing,submitting
2008-08-11 (Monday)
10:00 - 14:00 font.test
16:00 - 20:00 menu.test
22:30 - 1:00 clrpick.test
2008-08-10 (Sunday)
10:00 - 18:00 canvImg.test, canvRect,
canvText.test
2008-08-9 (Saturday)
13:00 - 20:00 canvImg.test, canvRect,
canvText.test
2008-08-8 (Friday)
10:00 - 20:00 font.test, canvImg
2008-08-7 (Thursday)
8:00 - 22:00 config.test,canvas.test
2008-08-6 (Wednesday)
10:00 - 18:00 canvPs.test, canvas.test
2008-08-5 (Tuesday)
visiting Google Krakow
2008-08-4 (Monday)
visiting Google Krakow
2008-08-3 (Sunday)
10:00 -14:00 testing, commits, evaluation letter
2008-08-2 (Saturday)
11:00 - 19:00 menu.test
2008-08-1 (Friday)
8:00 - 8:00 went away
2008-07-31 (Thursday)
text.test (a huge one and a lot
of time spent on that)
2008-07-30 (Wednesday)
upgrading my script, text.test
2008-07-29 (Tuesday)
text.test
2008-07-28 (Monday)
get.test
text.test
2008-07-27 (Sunday)
cursor.test
dialog.test
2008-07-26 (Saturday)
free day
2008-07-25 (Friday)
cmds.test
cursor.test
2008-07-24 (Thursday)
cursor.test
2008-07-23 (Wednesday)
10:30 - 23:00 (9h) bind.test
2008-07-22 (Tuesday)
11:00 - 14:00 cvs-ing
14:30 - 15:00 button.test corrections
20:00 - 22:30 bind.test
2008-07-21 (Monday)
14:30 - 18:00 corrections and updates in my done files
2008-07-20 (Sunday)
9:00 - 14:00 spinbox.test
14:30 -16:00 Mail to Jeff, collecting points
2008-07-19 (Saturday)
11:00 - 19:00(7h) my new script - helper
2008-07-18 (Friday)
8:00 - 8:00 went away
2008-07-17 (Thursday)
8:00 - 8:00 went away
2008-07-16 (Wednesday)
8:00 - 8:00 went away
2008-07-15 (Tuesday)
11:00 - 14:30 spinbox.test
2008-07-14 (Monday)
11:00 - 20:00(9h) entry.test, my helping script
2008-07-13 (Sunday)
11:00 - 22:00(9h) entry.test, font constraint
22:00 - 1:30 putting down changes, questions, notices
2008-07-12 (Saturday)
11:00 - 24:00(10h) entry.test, testImg constraint
2008-07-11 (Friday)
10:00 - 11:30 new info analisation
19:00 - 22:00 button.test - addings and again
touching up
2008-07-10 (Thursday)
13:30 - 13:45 bell.test
13:45 - 14:00 bgerror.test
14:15 - 15:15 correcting some points in button.test
15:15 - 15:45 testing individual tests - my script
16:00 - 16:30 bitmap.test
16:00 - 16:30 border.test
16:30 - 17:30 updating
2008-07-09 (Wednesday)
11:45 - 21:00 button.test
2008-07-08 (Tuesday)
11:00 - 3:00(~14h) writting email to Tclcore that
skets my goals - analysing my work,
outlining ideas, posing questions,
reconsidering and final conclusions
2008-07-07 (Monday)
11:00 - 19:00 message.test - corrections
button.test - corrections and implementing
22:00 - 0:00 first draft of email to tclcore
2008-07-06 (Sunday)
13:00 - 17:00(2.5h) message.test
17:45 - 21:00 button.test
2008-07-05 (Saturday)
13:00 - 14:00 Mails from TCL-CORE: Learning
advices and new assumptions
16:00 - 17:00 More SuSE configuring
19:00 - 1:00(3h) Learning about tcltest 1.0,
first drafts on message test
updating wiki - (?)frame.test frame-2.5
(after DKF's comment)
2008-07-04 (Friday)
13:00 - 15:00 TCL-CORE, TCL-SOC2008, D.K.Fellow mails
20:00 - 1:00 New systems instalations and settings,
configuring VisualStudio settings on XP
2008-07-03 (Thursday)
13:00 - 15:00 Collecting all together and presenting to Jeff;
writing organisation mail
16:15 - 17:00 Frame.test - frame-2.5 under windows
19:00 - 22:00(2h) Fonts and constraints; updating flow
22:30 - 4:30 Scrollbar.test; posting assembla flow; tunning up old flows
2008-07-02 (Wednesday)
11:00 - 13:00 comparing logs
examing why Total differ
15:00 - 24:00 wm.test:
> not updating after 'update' (wm-minsize-2.*) and
unspecified behaviour of test
> wm-geometry-2.1 - what's up in Ubuntu, comparing
with live distribution
> preparing questions on wiki
2008-07-01 (Tuesday)
9:30 - 15:00 frame.test
16:00 - 19:00 reading about widgets
22:00 - 24:00 http://www.assembla.com/wiki/edit/TkTests, svn
2008-06-30 (Monday)
11:00 - 12:00 TkTests on Ubuntu
12:00 - 12:30 collecting logs from systems
12:30 - 15:30 listbox.test invalid on Windows
(and eventualy, after solving out, finding out that I haven't
updated my Windows tcl, where the test is fixed; gained
primary experience though;) )
16:30 - 19:00 Scanning generic folder
2008-06-29 (Sunday)
9:00 - 11:30 (2.5h) what's the problem with font constraints on my Slack?;
constraints.tcl,
textIndex.test (tests pass if constraint font is removed)
11:30 - 14:00 encountered and fixing some difficulties with my system
14:00 - 15:00 installing ubuntu and stuff
17:00 - 21:00 configuring ubuntu, testing
2008-06-28 (Saturday)
9:00 - 12:00 (2.5h) preparing the mail to Jeff about project assumptions
20:00- 0:30 (3.5h) going through windows tests; winDialog.test
2008-06-27 (Friday)
14:00 - 16:30 meeting with Tomek Kosiak and analysing the project
18:00 - 22:30(1.5h) analysing message.c sources
22:30 - 1:00 preparing the mail to Jeff about project assumptions